Santa Clara County Cool Roof County
County of Santa Clare.
eerF
General Services Agency
Facilities Department
Building Operations Division
1555 Berger Drive #3
San Jose, California 95112
(408)299-4181 FAX 297-2476
May 31, 2001
TO:
G. Kevin Carruth, Director
General Services Agency
FROM:
Steve Black, Manager
>
Building Operations Divisfen
SUBJECT: Santa Clara County Cool Roof Program
There has been substantial interest expressed in the Cool Roof
spreadsheets outline the General Services Agenr^s
efforts, via
ng O^ons
planned^uiW
acbvibes
Division to install cool roof products and Building Operations
rontinued participation in the now certified Cool Roof Incentive Program being offered
by the California Energy Commission(CEC).
The
first sheet entitled Comp/eted Roof
lists the
have been covered with this light or white colored material
since installed
M7 or a sealer
m^enals
was being
are either an actual roof membrane viihere a new roofPnor
to the announrement irf the
coating that was applied to roofs to extend their life. lighter
colored matenals on 28
CEC program, Building Operations had installed these
County roofs encompassing 682,300 square feet of roof.
The second spreadsheet entitled Scheduled RoofProjects
lists the
buildings ^
by
Building
Operations.
Dlanned for the cool roof material over the next year
expand
our program to another 11 County roofs and add ^2,500 square feet of roof to
^orOTram at a cost of $1,047,600. These projects are funded through the FY 2001
our
Back!S
Pr^ram or planned for funding through the FY 2002 Backlog Ptogra^o
accelerate the installation of these projects Building
°P®^f'°"®'®^^®er^200i^ndInto
contract out the projects that were originally programmed
for late ^rnrner
2001proj
an^to
conservation
from these
the calendar year 2002 roofing season so that energy
can be realized sooner.
The third Spreadsheet entitled Backlog Projects, lists the
futu^re and the worWoad ran
available
oroiects that will be programmed when funds become
expand the cool roof application an
be managed. These identified projects will further
additional 456,680 square feet of roof at a cost of $2,584,000.
These three spreadsheets represeht apprcxiraately 80% of the roef
by Building Operations, The remaining roofs are either too
^
;SS£SS-HFaS5iai;roelro;^
Wehtifled as needing re-rooflng maintenanoe. Our Roofing Management Plan will
eventually include these remaining roofs.
of California
The' “Cool” roofs that were installed prior to the passage
issislSs-:
of the 2002 Cool Roof Program incentive when and if it is announced.
cc: Susan Phillips
Bob Whitehair
COMPLETED COOL ROOF PROJECTS
FAC «
Buildmg
ST#
?0
Address
W fitDOINGST
west
Floor
»
Color
Dat«
Date
Schoduleii
Completed
C*ey
Zip
Oidg Use
Bldg Footage
Roof Footage
SAM JOSE
9St10
OFfICE
110^
20.000
It Gray
2000
Comments
'KlJti; VJ r LULU PHTTCESS"
0102
ccoo WEST were
0104
MAIN JAIL SOUTH • OOC
idO
w hEOOinG ST
SATJ jose
«tio
JAB.
13,200
18.9M
It Gray
2000
NEW 93 COl0 F^OCESS I PM
0103
SAN XJSE MfepaAS MUNICIPAL COURT
200
VV HEOOING ST
SArr JOSE
«iio
COURT
70.100
i».300
H Gray
1999
NEW 98 COl O PROCE SS f PM
DOWNTOWN SUPERIOR COURT
191
NORTH FIRST ST
SAM JOSE
95133
COURT
124.600
20.r®7
While
1997
NEW 96 COtOPROCESSfPM
MM
SMERtFF-SDEPAilTMtNT
55
W YOUNGER ST
SAMTOSE
95110
OFFICE
97.400
48.700
White
2000
FOAM
0«1
GSA COMMUNICATIONS-MAIN UlDC
2700
CAROL DR
SAN JOSE
95125
OFFICE
26.560
».6eo
While
1998
NEW 97 CCHO PROCESS/PM
0503
GSACOMMUNICATCNS-SERVICE BLOG
2700
CAROL DR
SAN JOSE
55125
SUPPORT
10.000
10.000
While
1998
NE w 97 COlO PROCESS/PM
0704
CAST VALLEY MEAlTH
1989
MCKEE RO
SAN JOSE
95116
CL»dC
15.600
15.600
While
1997
BURjCaP
0730
AiEXiANOR COMPiEX
2101
M.EXIAN DR
SAN JOSE
95115
OFFICE
17.300
16.000
White
2000
NEW 00 OUR/CAP
axa
NORTH COUNTY mental mEALTJ
231
GRANT ST
PALO ALTO
94X«
CeiNlC
6 600
8.600
II. Gray
199S
NEW SPHINC 99k:OlO process
200*
t^ORTH COUNTY OFFICE
270
GFIANT ST
PAlOAUTO
94306
OFfICE
66.375
12.748
White
2000
NEW COLO PROCESS
2110
PROBATON-WORK FURLOUGH CENTER
S90
£ MiODLEFlELORO
Ml view
94043
JAIL
33 118
53,116
White
1993
NEW 98 COLO PROCESS / PM
3461
SUNNYVALE MUNICIPAL COURT
605
W ELCAMINOREAL
SUNNYVALE
94087
COURT
21,000
21.000
While
1999
NEW 98 COLO PROCESS /PM
2403
FAIR OAKS MENTAL HEALTH CENTER
660
S FAIR OAKS A\^
SUNNYVALE
94087
CLINIC
6.600
6.800
H Gray
1998
NEW 98 COLD PROCESS t PM
2404
FAIR OAKS PUBLIC HEALTH CENTER
664
S FAIR OAKS AVE
SUNNYVALE
94087
OFFICE
12.400
12.400
LI Gray
1998
NEW 98 cotD PROCESS / PM
2»04
LOS CATOS MUNlCfAL COURT
J101
SOUTH COUNTY MAIN BLOG
14205
CAPRI OR
LOS GATOS
95030
COURT
17.000
12.000
While
1998
NEW 38 COlD PROCESS 7PM
60
W M!GFN>NOAVE
SAN MARTIN
95046
Office
17.600
17^
White
2001
NEWCOIOWOCESS
HIGHLAND AVE
SAN MARTIN
95048
COURT
24.560
24,580
WHITE
2001
NEW WHITE SINGLE PLY
5101'
JAMES RANCH-ADMINISTRATION 8LDG
19050
MaLAGUERRA AVE
MORGAN H1,L
95037
OFFICE
30.900
».M0
2000
NEW COLO PROCESS
SIM
JAMES RANCH DORMITORY
19050
MALAGUERRA AVE
MORGAN HAL
95037
JAA
2.000
2.000
S121
JAMES RATTCH-COVcREO WALKWAY
19050
MALAGUERRA AVE
MORGAN HAL
95037
SUPPORT
ts.ooo
15.000
3115 . SO COLHTTY COURT COMPLEX
S201
HOLDEN RANCH-AOMIN /OtNING/KnCHEN
19050
maiaguerraave
MORGAN HAL
95037
OFFICE
30.900
30.900
Lt- Gray
H Gray
LI Gray
Lt Gray
5204
HOLDEN RANCH DORMITORY / REC ROOM
19050
MAVAGOERRa AVE
MORGAH HILL
95037
JAA
3.000
3.000
1.1 Gray
2000
NEW COLD PROCESS
5901
WVENAE hall-main OETENTON BIOGS
840
GUADAl UPE PKWY
SAN X>S6
95110
JAA
160.700
52.140
It Gray
1997
NEW 98 COLO PROCESS/PM
2000
NEW 98 / COLO PROCESS/ PM
1997
COLO PROCESS
200Q
NEW COLO PROCESS
5902
•H VENAE MALL-K(TChEN/SHOP
840
GUADALUPE PKWY
SAN JOSE
95110
Office
20.000
20.000
New,92/Pi.i
JUVENILE MALL-OSBORNE SCHOOL (Cl.ASSROQMi
640
CUADAiUPE PKWY
SAN JOSE
95110
SCHOOL
2.400
2,400
II Gray
Lt Gray
1997
5905
1995
new 921 PU
6144
EL MWD REHAB CNTR CCW W1 tOl.DWQF MAINfllOG)
/0I
S ABEL ST
SAN JOSE
95110
JJUL
IB.200
18,200
White
1997
NEW96 - UNDER PM
Subtotal Sq. Ft.
Roof Proiecl 0S21O16/3I/2OOT
1,288,137
682,329
Estimate
.SCHEDULED ROOF PROJECTS
ElectficAccN
Building
FAC M
6101
ELKtWO REHAB CNTR-OLO ADMINrSUPPORT aVCS
ADMIN
ST«
Address
o
Bldg Use
Bldg
Footage
Roof
Floor #
Color
Footage
WHITE/
701
S ABE I ST
CVP28B5ti5l
OFFICE
5.300
4.000
1
LT GREY
Date
Date
Scheduled
Completed
Comments
Estimate
5/1/2001
SPRAY WHITE COLD PROCESS
i32.000 00
itBSOOOO
EtKtWD RLHABCNTR-OlD PROCESSING HI DG
701
JAIL
16,900
7.500
1
WHITE EPDM
5/1/2001
6146
S AQEl ST
COLD PROCESS WHITE
701
S ABEL ST
JAIL
5.000
5.000
WHITE GRAVEL
5/2/2001
COLO PROCESS WHIT E
ELf.WD REHAB CNTR-CCW-MEOlUM WEST NO/SO
1
6149
1309
J205
3112
0935
ALCOHOL RECOVERY • MARIPOSA LODGE
SSA CHILD PROTECTIVE SERVICES
SOUTH COUNTY MENTAL HEALTH
MEDICAL EXAMINER/CORONER
0103). HALL OF JUSTICE
5500
7350
80
HOUSING
IvtALECH RD
OFFICE
ROSANNA ST
OFFICE
W HIGHLAND AVE
850
THORNTON WAY
190
W HEOOING ST
HVP4319552
23,748
4,650
24.000
30.000
2
5,500
1
24.000
1
OFFICE
20.300
14.000
1
COURT
138.900
19.100
4
EAST valley MENTAL HEALTH
1991
MCKEE RO
CLINIC
10.000
8.390
1
0707
130$^''
MURIEL WRIGHT GiRlS RANCH-AOMIN I DORMS
298
W BERNAL RO
JAIL
20,800
28,500
1
1,4«10
28.600
1
271,038
172,500
1302*
PROBATION MURIGL WRIGHT GIRLS RANCH
Cl-ASSROOM
298
VV 8ERNAI. RO
Subtotal Sq. Ft.
Root ProjQ
1015/31/2001
MODULAR
WHITE GfLAVEL
WHITE
CAPSHEET
WHITE
CAPSHEET
WHITE
HYPALON
WHITE
CAPSHEET
WHITE
CAPSHEET
Single Ply
Torch Down
Single Ply
Torch Down
S15.000 00
$144,000-00
6/1/2001
SINGLE PLY WHITE
6/1/2001
SINGLE PLY WHITE
$85,000 00
7/1/2001
OCLD PROCESS WHITE
$108.000 00
8/1/2001
SINGLE PLY WHITE
$280,000 00
9/1/2001
COLO PROCESS WHITE
$218.000 00
5/1/2002
COLD PROCESS WHITE
$67,000.00
8/1/2001
COLO PROCESS WHITE
$0^000.00
8/1/2001
COLD PROCESS WHITE
TlFf
Total Estimate: $1,047,600.00
BACKLOG ROOF PROJECTS - ESTIMATED
Priority
FAC #
Building
St. U
Address
Bidg Use
171
W. YOUNGER ST
GARAGE
976
LEN2EN AVe
CLINIC
Bidg fooiage Roof footage
Floor M
Dale
Data
Schodulod
Ccmplated
Estimate
800
1
$10,000.00
24.900
4
$393,000.00
6.700
t
5108.000,00
6.240
1
$130,000.00
242.3G0
66.300
4
$210,000.00
OFFICE
9.548
107.000
4
$107,000.00
GUADALUPE PKWY.
OFFICE
21.879
21.879
1
640
S. ABEL ST.
SCHOOL
2,400
21.879
1
JAMES RANCH-KITCHEN & DINING
19050
MALAGUERRA AVE.
SUPPORT
3,648
3,648
t
$41,000-00
JAMES RANCH-RECREATION HALL
19050
MALAGUERRA AVE.
SUPPORT
7.171
7.171
1
$29,000.00
5111
JAMES RANCH-OFFICE/CIASSROOMS/SHOPS
19050
MALAGUERRA AVE.
OFFICE
7.669
7.669
t
$54,000,00
I
11
0209
DOWNTOWN SUPERIOR COURT
191
NORTH FIRST ST.
COURT
124.600
35.000
7
$80,000.00
I
12
6185
ELMWD REHAB CNTR-NEW PROGRAMS BLDG/SHOPS
701
S. ABEL ST.
SUPPORT
33.374
17.000
2
$153,000.00
13
6187
ELMWD REHAB CNTR-MEOICAUPROCESSING
701
S, ABEL ST
OFFICE
43,070
26.439
2
$200,000.00
14
6193
ELMWD REHAB CNTR-NEW ADMINISTRATION BLDG
701
S. ABEL ST
OFFICE
34.920
34.920
1
$300,000.00
15
6134
ELMWD REHAB CNTR-CARPENTRY SHOP (OLD BLOCK
HOUSE)
701
S ABEL ST
SUPPORT
3 691
3.691
1
S3.000 00
16
0114
MAIN JAIL NORTH - DOC
150
W. HEDDING
JAIL
325.000
35,193
10
$352,000.00
17
0407
GSA-GARAGE GAS STATION
90
W- YOUNGER ST.
OFFICE
60,000
946
1
$8,000.00
18
6111
ELMWD REHAB CNTR-DINING HALL(OLD KITCHEN)
701
S. ABEL ST
SUPPORT
11.055
1
$94.000 00
1
0121
CIVIC CENTER PARKING 40g
2
0916
PARK ALAMEDA 455
3
3109
SOUTH COUNTY MEDICAL 120
90
W HIGHLAND AVE,
OFFICE
4
2902
WEST VALLEY HEALTH 63
375
KNOWLES DR
CLINIC
5
5602
COUNTY SERVICE CENTER-BUILDING tf2
1555
BERGER DR
OFFICE
6
5904
JUVENILE HALL-GYMNASIUM
840
GUADALUPE PKWY.
7
5902
JUVENILE HALL-KITCHEN/SHOP
840
7
5905
JUVENILE HALL-OSBORNE SCHOOL(CLASSROOM)
8
5109
9
5110
10
74.300
n.055‘
$153,000.00
19
6114
ELMWD REHAB CNTR-EAST GATE
701
S ABEL ST
OFFICE
100
100
1
$1,000.00
20
6127
ELMWD REHAB CNTR-SHOP(OLD CLOTHING)
701
S. ABEL ST.
SUPPORT
1.760
1.760
1
$21.000 00
21
6145
ELMWD REHAB CNTR-CHAPEL (LIBRARY)
701
S ABEL ST.
OFFICE
2.331
2.331
1
$26.000 00
22
5104
JAMES RANCH-VOCATIONAL EDUCATION
19050
MALAGUERRA AVE
OFFICE
5,268
5.268
1
$34,000 00
23
5107
JAMES RANCH-TRAINING ROOM & FREEZER
19050
MALAGUERRA AVE.
SUPPORT
2.657
2.657
1
$16,000.00
24
5113
JAMES RANCH-MAINTENANCE
19050
MALAGUERRA AVE.
SUPPORT
1,820
1,820
1
$20,000.00
25
5114
JAMES RANCH-SUPERlNTENOENrS HOUSE
19050
MALAGUERRA AVE.
HOUSE
2.818
2.818
1
$30.000 00
26
5117
JAMES RANCH-TOOL ROOM 15
19050
MALAGUERRA AVE.
SUPPORT
1.500
1.500
1
$11,000.00
1,022,879
456,684
Subtotal Sq. Ft.
Roof PfOjCCt 0521015/31/2001
Total: $2,584,000.00
eerF
General Services Agency
Facilities Department
Building Operations Division
1555 Berger Drive #3
San Jose, California 95112
(408)299-4181 FAX 297-2476
May 31, 2001
TO:
G. Kevin Carruth, Director
General Services Agency
FROM:
Steve Black, Manager
>
Building Operations Divisfen
SUBJECT: Santa Clara County Cool Roof Program
There has been substantial interest expressed in the Cool Roof
spreadsheets outline the General Services Agenr^s
efforts, via
ng O^ons
planned^uiW
acbvibes
Division to install cool roof products and Building Operations
rontinued participation in the now certified Cool Roof Incentive Program being offered
by the California Energy Commission(CEC).
The
first sheet entitled Comp/eted Roof
lists the
have been covered with this light or white colored material
since installed
M7 or a sealer
m^enals
was being
are either an actual roof membrane viihere a new roofPnor
to the announrement irf the
coating that was applied to roofs to extend their life. lighter
colored matenals on 28
CEC program, Building Operations had installed these
County roofs encompassing 682,300 square feet of roof.
The second spreadsheet entitled Scheduled RoofProjects
lists the
buildings ^
by
Building
Operations.
Dlanned for the cool roof material over the next year
expand
our program to another 11 County roofs and add ^2,500 square feet of roof to
^orOTram at a cost of $1,047,600. These projects are funded through the FY 2001
our
Back!S
Pr^ram or planned for funding through the FY 2002 Backlog Ptogra^o
accelerate the installation of these projects Building
°P®^f'°"®'®^^®er^200i^ndInto
contract out the projects that were originally programmed
for late ^rnrner
2001proj
an^to
conservation
from these
the calendar year 2002 roofing season so that energy
can be realized sooner.
The third Spreadsheet entitled Backlog Projects, lists the
futu^re and the worWoad ran
available
oroiects that will be programmed when funds become
expand the cool roof application an
be managed. These identified projects will further
additional 456,680 square feet of roof at a cost of $2,584,000.
These three spreadsheets represeht apprcxiraately 80% of the roef
by Building Operations, The remaining roofs are either too
^
;SS£SS-HFaS5iai;roelro;^
Wehtifled as needing re-rooflng maintenanoe. Our Roofing Management Plan will
eventually include these remaining roofs.
of California
The' “Cool” roofs that were installed prior to the passage
issislSs-:
of the 2002 Cool Roof Program incentive when and if it is announced.
cc: Susan Phillips
Bob Whitehair
COMPLETED COOL ROOF PROJECTS
FAC «
Buildmg
ST#
?0
Address
W fitDOINGST
west
Floor
»
Color
Dat«
Date
Schoduleii
Completed
C*ey
Zip
Oidg Use
Bldg Footage
Roof Footage
SAM JOSE
9St10
OFfICE
110^
20.000
It Gray
2000
Comments
'KlJti; VJ r LULU PHTTCESS"
0102
ccoo WEST were
0104
MAIN JAIL SOUTH • OOC
idO
w hEOOinG ST
SATJ jose
«tio
JAB.
13,200
18.9M
It Gray
2000
NEW 93 COl0 F^OCESS I PM
0103
SAN XJSE MfepaAS MUNICIPAL COURT
200
VV HEOOING ST
SArr JOSE
«iio
COURT
70.100
i».300
H Gray
1999
NEW 98 COl O PROCE SS f PM
DOWNTOWN SUPERIOR COURT
191
NORTH FIRST ST
SAM JOSE
95133
COURT
124.600
20.r®7
While
1997
NEW 96 COtOPROCESSfPM
MM
SMERtFF-SDEPAilTMtNT
55
W YOUNGER ST
SAMTOSE
95110
OFFICE
97.400
48.700
White
2000
FOAM
0«1
GSA COMMUNICATIONS-MAIN UlDC
2700
CAROL DR
SAN JOSE
95125
OFFICE
26.560
».6eo
While
1998
NEW 97 CCHO PROCESS/PM
0503
GSACOMMUNICATCNS-SERVICE BLOG
2700
CAROL DR
SAN JOSE
55125
SUPPORT
10.000
10.000
While
1998
NE w 97 COlO PROCESS/PM
0704
CAST VALLEY MEAlTH
1989
MCKEE RO
SAN JOSE
95116
CL»dC
15.600
15.600
While
1997
BURjCaP
0730
AiEXiANOR COMPiEX
2101
M.EXIAN DR
SAN JOSE
95115
OFFICE
17.300
16.000
White
2000
NEW 00 OUR/CAP
axa
NORTH COUNTY mental mEALTJ
231
GRANT ST
PALO ALTO
94X«
CeiNlC
6 600
8.600
II. Gray
199S
NEW SPHINC 99k:OlO process
200*
t^ORTH COUNTY OFFICE
270
GFIANT ST
PAlOAUTO
94306
OFfICE
66.375
12.748
White
2000
NEW COLO PROCESS
2110
PROBATON-WORK FURLOUGH CENTER
S90
£ MiODLEFlELORO
Ml view
94043
JAIL
33 118
53,116
White
1993
NEW 98 COLO PROCESS / PM
3461
SUNNYVALE MUNICIPAL COURT
605
W ELCAMINOREAL
SUNNYVALE
94087
COURT
21,000
21.000
While
1999
NEW 98 COLO PROCESS /PM
2403
FAIR OAKS MENTAL HEALTH CENTER
660
S FAIR OAKS A\^
SUNNYVALE
94087
CLINIC
6.600
6.800
H Gray
1998
NEW 98 COLD PROCESS t PM
2404
FAIR OAKS PUBLIC HEALTH CENTER
664
S FAIR OAKS AVE
SUNNYVALE
94087
OFFICE
12.400
12.400
LI Gray
1998
NEW 98 cotD PROCESS / PM
2»04
LOS CATOS MUNlCfAL COURT
J101
SOUTH COUNTY MAIN BLOG
14205
CAPRI OR
LOS GATOS
95030
COURT
17.000
12.000
While
1998
NEW 38 COlD PROCESS 7PM
60
W M!GFN>NOAVE
SAN MARTIN
95046
Office
17.600
17^
White
2001
NEWCOIOWOCESS
HIGHLAND AVE
SAN MARTIN
95048
COURT
24.560
24,580
WHITE
2001
NEW WHITE SINGLE PLY
5101'
JAMES RANCH-ADMINISTRATION 8LDG
19050
MaLAGUERRA AVE
MORGAN H1,L
95037
OFFICE
30.900
».M0
2000
NEW COLO PROCESS
SIM
JAMES RANCH DORMITORY
19050
MALAGUERRA AVE
MORGAN HAL
95037
JAA
2.000
2.000
S121
JAMES RATTCH-COVcREO WALKWAY
19050
MALAGUERRA AVE
MORGAN HAL
95037
SUPPORT
ts.ooo
15.000
3115 . SO COLHTTY COURT COMPLEX
S201
HOLDEN RANCH-AOMIN /OtNING/KnCHEN
19050
maiaguerraave
MORGAN HAL
95037
OFFICE
30.900
30.900
Lt- Gray
H Gray
LI Gray
Lt Gray
5204
HOLDEN RANCH DORMITORY / REC ROOM
19050
MAVAGOERRa AVE
MORGAH HILL
95037
JAA
3.000
3.000
1.1 Gray
2000
NEW COLD PROCESS
5901
WVENAE hall-main OETENTON BIOGS
840
GUADAl UPE PKWY
SAN X>S6
95110
JAA
160.700
52.140
It Gray
1997
NEW 98 COLO PROCESS/PM
2000
NEW 98 / COLO PROCESS/ PM
1997
COLO PROCESS
200Q
NEW COLO PROCESS
5902
•H VENAE MALL-K(TChEN/SHOP
840
GUADALUPE PKWY
SAN JOSE
95110
Office
20.000
20.000
New,92/Pi.i
JUVENILE MALL-OSBORNE SCHOOL (Cl.ASSROQMi
640
CUADAiUPE PKWY
SAN JOSE
95110
SCHOOL
2.400
2,400
II Gray
Lt Gray
1997
5905
1995
new 921 PU
6144
EL MWD REHAB CNTR CCW W1 tOl.DWQF MAINfllOG)
/0I
S ABEL ST
SAN JOSE
95110
JJUL
IB.200
18,200
White
1997
NEW96 - UNDER PM
Subtotal Sq. Ft.
Roof Proiecl 0S21O16/3I/2OOT
1,288,137
682,329
Estimate
.SCHEDULED ROOF PROJECTS
ElectficAccN
Building
FAC M
6101
ELKtWO REHAB CNTR-OLO ADMINrSUPPORT aVCS
ADMIN
ST«
Address
o
Bldg Use
Bldg
Footage
Roof
Floor #
Color
Footage
WHITE/
701
S ABE I ST
CVP28B5ti5l
OFFICE
5.300
4.000
1
LT GREY
Date
Date
Scheduled
Completed
Comments
Estimate
5/1/2001
SPRAY WHITE COLD PROCESS
i32.000 00
itBSOOOO
EtKtWD RLHABCNTR-OlD PROCESSING HI DG
701
JAIL
16,900
7.500
1
WHITE EPDM
5/1/2001
6146
S AQEl ST
COLD PROCESS WHITE
701
S ABEL ST
JAIL
5.000
5.000
WHITE GRAVEL
5/2/2001
COLO PROCESS WHIT E
ELf.WD REHAB CNTR-CCW-MEOlUM WEST NO/SO
1
6149
1309
J205
3112
0935
ALCOHOL RECOVERY • MARIPOSA LODGE
SSA CHILD PROTECTIVE SERVICES
SOUTH COUNTY MENTAL HEALTH
MEDICAL EXAMINER/CORONER
0103). HALL OF JUSTICE
5500
7350
80
HOUSING
IvtALECH RD
OFFICE
ROSANNA ST
OFFICE
W HIGHLAND AVE
850
THORNTON WAY
190
W HEOOING ST
HVP4319552
23,748
4,650
24.000
30.000
2
5,500
1
24.000
1
OFFICE
20.300
14.000
1
COURT
138.900
19.100
4
EAST valley MENTAL HEALTH
1991
MCKEE RO
CLINIC
10.000
8.390
1
0707
130$^''
MURIEL WRIGHT GiRlS RANCH-AOMIN I DORMS
298
W BERNAL RO
JAIL
20,800
28,500
1
1,4«10
28.600
1
271,038
172,500
1302*
PROBATION MURIGL WRIGHT GIRLS RANCH
Cl-ASSROOM
298
VV 8ERNAI. RO
Subtotal Sq. Ft.
Root ProjQ
1015/31/2001
MODULAR
WHITE GfLAVEL
WHITE
CAPSHEET
WHITE
CAPSHEET
WHITE
HYPALON
WHITE
CAPSHEET
WHITE
CAPSHEET
Single Ply
Torch Down
Single Ply
Torch Down
S15.000 00
$144,000-00
6/1/2001
SINGLE PLY WHITE
6/1/2001
SINGLE PLY WHITE
$85,000 00
7/1/2001
OCLD PROCESS WHITE
$108.000 00
8/1/2001
SINGLE PLY WHITE
$280,000 00
9/1/2001
COLO PROCESS WHITE
$218.000 00
5/1/2002
COLD PROCESS WHITE
$67,000.00
8/1/2001
COLO PROCESS WHITE
$0^000.00
8/1/2001
COLD PROCESS WHITE
TlFf
Total Estimate: $1,047,600.00
BACKLOG ROOF PROJECTS - ESTIMATED
Priority
FAC #
Building
St. U
Address
Bidg Use
171
W. YOUNGER ST
GARAGE
976
LEN2EN AVe
CLINIC
Bidg fooiage Roof footage
Floor M
Dale
Data
Schodulod
Ccmplated
Estimate
800
1
$10,000.00
24.900
4
$393,000.00
6.700
t
5108.000,00
6.240
1
$130,000.00
242.3G0
66.300
4
$210,000.00
OFFICE
9.548
107.000
4
$107,000.00
GUADALUPE PKWY.
OFFICE
21.879
21.879
1
640
S. ABEL ST.
SCHOOL
2,400
21.879
1
JAMES RANCH-KITCHEN & DINING
19050
MALAGUERRA AVE.
SUPPORT
3,648
3,648
t
$41,000-00
JAMES RANCH-RECREATION HALL
19050
MALAGUERRA AVE.
SUPPORT
7.171
7.171
1
$29,000.00
5111
JAMES RANCH-OFFICE/CIASSROOMS/SHOPS
19050
MALAGUERRA AVE.
OFFICE
7.669
7.669
t
$54,000,00
I
11
0209
DOWNTOWN SUPERIOR COURT
191
NORTH FIRST ST.
COURT
124.600
35.000
7
$80,000.00
I
12
6185
ELMWD REHAB CNTR-NEW PROGRAMS BLDG/SHOPS
701
S. ABEL ST.
SUPPORT
33.374
17.000
2
$153,000.00
13
6187
ELMWD REHAB CNTR-MEOICAUPROCESSING
701
S, ABEL ST
OFFICE
43,070
26.439
2
$200,000.00
14
6193
ELMWD REHAB CNTR-NEW ADMINISTRATION BLDG
701
S. ABEL ST
OFFICE
34.920
34.920
1
$300,000.00
15
6134
ELMWD REHAB CNTR-CARPENTRY SHOP (OLD BLOCK
HOUSE)
701
S ABEL ST
SUPPORT
3 691
3.691
1
S3.000 00
16
0114
MAIN JAIL NORTH - DOC
150
W. HEDDING
JAIL
325.000
35,193
10
$352,000.00
17
0407
GSA-GARAGE GAS STATION
90
W- YOUNGER ST.
OFFICE
60,000
946
1
$8,000.00
18
6111
ELMWD REHAB CNTR-DINING HALL(OLD KITCHEN)
701
S. ABEL ST
SUPPORT
11.055
1
$94.000 00
1
0121
CIVIC CENTER PARKING 40g
2
0916
PARK ALAMEDA 455
3
3109
SOUTH COUNTY MEDICAL 120
90
W HIGHLAND AVE,
OFFICE
4
2902
WEST VALLEY HEALTH 63
375
KNOWLES DR
CLINIC
5
5602
COUNTY SERVICE CENTER-BUILDING tf2
1555
BERGER DR
OFFICE
6
5904
JUVENILE HALL-GYMNASIUM
840
GUADALUPE PKWY.
7
5902
JUVENILE HALL-KITCHEN/SHOP
840
7
5905
JUVENILE HALL-OSBORNE SCHOOL(CLASSROOM)
8
5109
9
5110
10
74.300
n.055‘
$153,000.00
19
6114
ELMWD REHAB CNTR-EAST GATE
701
S ABEL ST
OFFICE
100
100
1
$1,000.00
20
6127
ELMWD REHAB CNTR-SHOP(OLD CLOTHING)
701
S. ABEL ST.
SUPPORT
1.760
1.760
1
$21.000 00
21
6145
ELMWD REHAB CNTR-CHAPEL (LIBRARY)
701
S ABEL ST.
OFFICE
2.331
2.331
1
$26.000 00
22
5104
JAMES RANCH-VOCATIONAL EDUCATION
19050
MALAGUERRA AVE
OFFICE
5,268
5.268
1
$34,000 00
23
5107
JAMES RANCH-TRAINING ROOM & FREEZER
19050
MALAGUERRA AVE.
SUPPORT
2.657
2.657
1
$16,000.00
24
5113
JAMES RANCH-MAINTENANCE
19050
MALAGUERRA AVE.
SUPPORT
1,820
1,820
1
$20,000.00
25
5114
JAMES RANCH-SUPERlNTENOENrS HOUSE
19050
MALAGUERRA AVE.
HOUSE
2.818
2.818
1
$30.000 00
26
5117
JAMES RANCH-TOOL ROOM 15
19050
MALAGUERRA AVE.
SUPPORT
1.500
1.500
1
$11,000.00
1,022,879
456,684
Subtotal Sq. Ft.
Roof PfOjCCt 0521015/31/2001
Total: $2,584,000.00
Document
Outline of General Services Agency's efforts, via the Building Operations Division to install cool roof products and Building Operations planned activities for the continued participation in the now certified Cool Roof Incentive Program
Initiative
Collection
James T. Beall, Jr.
Content Type
Correspondence
Resource Type
Document
Date
05/31/2001
District
District 4
Creator
Steve Black
Language
English
City
San Jose
Rights
No Copyright: http://rightsstatements.org/vocab/NoC-US/1.0/